Bellaire High School Addition and Renovations

Houston, Texas

Owner: Houston ISD
Architect: Gensler
$11.3 M
LEED Silver®
LEED_Gold

The Bellaire High School Additions and Renovations project included construction of a new 53,539 SF science wing and renovations to the existing school building. The $11.3 million project provides much needed additional labs and classrooms and relieves crowded conditions at the school built in 1955. During preconstruction, S&P’s CMAR team provided Gensler with detailed constructability review comments supporting the interface between the existing building and the new addition on all three floors.

On the existing building, S&P provided interior upgrades and renovations that include improvements to technology, mechanical, HVAC, electrical, plumbing, and fire and safety systems.

S&P provided BIM-based constructability input on the structural design, membrane, decking and waterproofing/flashing to ensure the green roof was fully functional, sustainable and 100% watertight.